
On 8th October, 3 of us set out to block off an existing path at the Thames Water end of the site and clear a path up towards the ditch, with a view of creating a new path all the way up to the stream. We got as far as the ditch and these were some of the 'after' pictures!
Picture 1: Cleared up to the ditch!
Picture 2: The blocked off entrance and the cleared path.

No comments:
Post a Comment